Feasibility study for the upgrade of the Gabčíkovo Hydroelectric Power Plant

Client:
Vodohospodárska výstavba, š.p.

In cooperation with Grant Thornton, a feasibility study was conducted for the upgrade and modernisation of the Gabčíkovo Hydroelectric Power Plant in Slovakia. The objective was to provide the customer with the necessary data to develop a strategy for the continued operation of these energy sources.

Jiří Brázdil
division director and Head of Accredited Laboratory