The objective of the project is to conduct a structural and technical survey of selected building elements at CEZ locations designated for demolition. The survey report is prepared in accordance with the 2018 Methodological Guidance from the Waste Management Department of the Ministry of the Environment, focusing on the management of construction and demolition waste. The following works have been carried out: Dětmarovice Power Plant – fly ash silos; Ledvice Power Plant – desulphurisation; Ledvice Power Plant – engine room; Mělník Power Plant – chimney; Počerady Power Plant – entire site; Průnéřov Power Plant – plant 1 site; Prunéřov Power Plant – oil management; Dvůr Králové Heating Plant – K3 engine room; Dvůr Králové Heating Plant – entire site; Trnice Heating Plant – entire site. The contracts have been executed since 2009.